| Contract Amount: $375,000 |
This project consisted of a pre-engineered steel building for the maintenance of all grounds keeping equipment. The building included a monolithic slab, standing seam roof, interior offices, and overhead doors. As to schedule, the structure was located inside an endangered species zone with stringent construction constraints. The project was completed in 3 months. |